The bus has provision of a kneeling mechanism with manual ramp for disabled persons, 5. The cost of each coach is ₹4 crore (US$560,000). 22:00 Hrs. DPR prepared for extension from Greater Noida to upcoming, Noida Metro Rail Corp (Feeder bus services), This page was last edited on 10 December 2020, at 03:18. The line will become fully operational by Dec 2018. Jan 2019: On 25 January, Aqua line was inaugurated by Uttar Pradesh Chief Minister. NMRC is a Joint Venture Company of Government of India (GoI) and Government of Uttar Pradesh (GoUP) established for the purpose of planning, building and establishing of Mass transit and other urban transport and people mover systems of all types and disciplines. Construction on Noida Metro’s 29.7 km elevated Line-1 started in May 2015. On Sundays, trains are available between 8:00am and 10:00pm. Each train has a seating capacity of 186 and a standing capacity of 848, with total capacity of 1,034 passengers. [37] All stations are equipped with platform screen doors. Jun 2020: Tenders invited and to be submitted by end of June-2020. Noida part of the Delhi NCR is connected to the capital through the Blue Line of Delhi Metro. Nevertheless, as there is no actual connection with Delhi Metro and a large part of the area served is still unbuilt, the patronage is very desappointing with only 11 000 passengers a day as of 01 2019. However, these two metro station are not connected via metro. Two routes have also been dedicated for connectivity between the cities of Noida and Greater Noida. This corridor is 9.605 kms long consisting of five (05) elevated stations namely Noida Sector 122, Noida Sector 123, Greater Noida Sector 4, Ecotech 12 and Greater Noida Sector 2. Sep 2018: Trials continued for extended month till November 2018. A Special Purpose Vehicle (SPV) called the Noida Metro Rail Corporation (NMRC) was formed to implement the project. Construction on Noida Metro’s 29.7 km elevated Line-1 started in May 2015. The Aqua Line, which connects the twin cities of Noida and Greater Noida in Gautam Buddh Nagar, has an average daily ridership of around 25,000 passengers, according to … [8], The Greater Noida Industrial Development Authority (GNIDA) approved an extension of the Aqua Line as part of Phase 2 of the metro project on 4 December 2018. Block-III, 3rd Floor, Ganga Shopping Complex, The Metro line in this corridor will has 22 stations, out of which 15 stations are in Noida and 7 in Greater Noida. The services of the Noida-Greater Noida metro were suspended on March 22 due to the coronavirus outbreak. The Noida Metro Rail Corporation (NMRC) commenced operations of the Aqua Line (Noida - Greater Noida Metro Corridor) on January 25. Commuters could buy QR-coded paper tickets or use smart cards on the 29.7-km-long network, officials said. GREATER NOIDA: The Greater Noida Industrial Development Authority has approved the extension of phase 2 metro connectivity from Noida Sector 71 to Knowledge Park 5 in Greater Noida… Nineteen rakes with four coaches each, a total of 76 coaches, will operate of the Aqua Line. The UP government cleared the decks for the expansion of the metro network in Noida by approving an extension of the Aqua Line to Noida Extension and further on to Greater Noida’s Knowledge Park V. The Noida Metro Rail Corporation (NMRC) commenced operations of the Aqua Line (Noida – Greater Noida Metro Corridor) on January 25. The system has all elevated stations using standard-gauge tracks. (Apni Metro), A modern metro rail link joining the twin cities of Noida and Greater Noida governed by The period of agreement is five years, and per the details … The NMRC will install solar panels on the rooftops of all stations, footbridges, its main office building, the depot and parking lot boundary walls to generate an estimated 12 MW of solar power daily. At this rate, the corridor is expected to be operational publicly by May 2017. A modern metro rail link joining the twin cities of Noida and Greater Noida governed by Foundation for the NMRC project was laid down in October 2014, with the construction being commenced by the end of December 2014 by then Chief Minister of Uttar Pradesh Akhilesh Yadav. Explaining the choice, NMRC managing director Santosh Yadav stated, "Aqua signifies an eco-friendly colour, which is what we want to portray. Two stations at Knowledge Park-I and Sector Delta-1 in Greater Noida are planned for future expansion. “It is acknowledged for successful operationalization of the project, it is essential for the project to be self- sustainable by implementing innovative revenue enhancement options and project structuring among others,” said a NMRC official. The government also appointed the Delhi Metro Rail Corporation (DMRC) as the turnkey consultant for the project. Scheduled to … The Noida Metro is a rapid transit system connecting the twin cities of Noida and Greater Noida in Gautam Buddh Nagar, Uttar Pradesh, India. Urban Mass Transit Company (UMTC) presented the assessment of requirement of buses on 27 routes by conducting a survey for the city bus service and monitoring will be done by Uttar Pradesh State Road Transport Corporation. The metro is operated under CBTC control, supplied by Ansaldo STS. While one route will provide service as Metro feeder buses, two routes will cover intra city service, while one route will be for intra connectivity in Greater Noida city. Technical specification of buses compatible with Urban Bus Specification –II as published by MOUD Govt. The line has 21 stations and runs from the Sector 51 station in Noida to the Depot station in Greater Noida, covering a distance of 29.7 km via 21 stations. The Noida-Greater Noida Metro will resume services from September 7 with curtailed timings, and only passengers with face masks and body temperature not … Aug 2019: Project to get delayed due to financial viability. Starting from Noida City Centre in Sector 32, the proposed Metro corridor will lead towards … 2) The new rail link is expected to connect the densely populated areas of … The last date for submission of bids for the contract would be October 31, 2020, the NMRC said. [6] The Uttar Pradesh Cabinet approved the project and forwarded the DPR to Government of India in October 2013. The operated 29.7-kilometre (18.5 mi) Aqua Line has 21 stations. The Aqua Line, which connects the twin cities of Noida and Greater Noida in Gautam Buddh Nagar, has an average daily ridership of around 25,000 passengers, according to … [6], The NMRC announced on 30 November 2016 that the first line of the metro would be called the Aqua Line. [40], Rapid transit system serving Noida and Greater Noida in the National Capital Region of India, Greater Noida Industrial Development Authority, Learn how and when to remove this template message, Uttar Pradesh State Road Transport Corporation, List of Noida Greater Noida metro stations, "Contact Us – Noida Metro Rail Corporation Ltd", "After 1 year, NMRC to operate Aqua Line", "Noida metro: Noida: Aqua Line trains every 7.30 min during rush hours from June 3 | Noida News - Times of India", "Inauguration of Noida-Greater Noida metro line likely on Jan 25, says NMRC", "Aqua Line ready for launch, nod awaited from UP", "UP government approves 15-km Metro link between Noida Sec 71 and Greater Noida", "Metro extension: Noida ready for Aqua line second phase, 9 more stations including seven in Greater Noida", "UP clears Metro to Greater Noida – Times of India", "Plan to ease busy stretches on Greater Noida Metro route", "Noida Metro to be ready for trials by July '18: DMRC chief", "Noida-Greater Noida Metro work progressing as per schedule", "Noida Metro company to hold its Board meeting on March 10 in Lucknow – Times of India", "Noida Metro speeds up work of 21 stations on Greater Noida line", "अप्रैल, 2018 में शुरू हो जाएगी नोएडा मेट्रो", "Work on Noida metro 95% complete, NMRC looks to hire more staff", "Aqua Line Metro trials to begin by year-end – Times of India", "Greater Noida Metro: Here is how passengers can benefit", "First Noida-Greater Noida Metro train to arrive in December – Times of India", "DMRC completes viaduct on Noida-Greater Noida corridor", "Noida gets metro coaches but test run faces delay", "First Aqua line train arrives from China – Times of India", "Power infra in place, Noida Metro trials to start in April – Noida NYOOOZ", "दिसंबर से पहले शुरु हो जाएगी ऐक्वा मेट्रो, पहली बार ये होगा नया | Noida NYOOOZ", "PM Modi may open Greater Noida, Ghaziabad metro on Christmas", "Fares announced for Noida Metro's Aqua Line, inauguration date awaited | Noida News - Times of India", https://timesofindia.indiatimes.com/city/noida/metro-extension-may-be-delayed-over-funds-as-government-looks-at-ppp-model/articleshow/70778344.cms, https://www.financialexpress.com/infrastructure/noida-metro-aqua-line-all-set-for-expansion-with-these-5-five-metro-stations-details-here/1977522/, https://www.hindustantimes.com/noida/nmrc-to-soon-finalise-agency-for-construction-of-aqua-line-extension/story-JWVysm05ZSHCYecyjtrCEK.html, "Metro rail link between Noida and Greater Noida to be completed by 2017", "DPR of Metro extension from Greater Noida to upcoming International Airport at Jewar ready", "Noida Metro unveils first look of Aqua line trains", "Solar power to make Noida Metro India's greenest", Delhi–Alwar Regional Rapid Transit System, Delhi–Meerut Regional Rapid Transit System, Delhi–Sonipat–Panipat Regional Rapid Transit System, https://en.wikipedia.org/w/index.php?title=Noida_Metro&oldid=993346180, All Wikipedia articles written in Indian English, Articles needing additional references from October 2018, All articles needing additional references, Creative Commons Attribution-ShareAlike License, Block-III, Ganga Shopping Complex, Sector-29, Noida. The services of the Noida-Greater Noida metro were suspended on March 22 due to the coronavirus outbreak. The first metro station working on this route is Sector - 51 Noida. [9][10] The new stations are Sector 122 and Sector 123 in Noida and Sector 4, Ecotech 12, Sectors 2, Sector 3, Sector 10, Sector 12 and Knowledge Park V in Greater Noida.[11]. The Noida Metro Rail Corporation (NMRC) commenced operations of the Aqua Line (Noida – Greater Noida Metro Corridor) on January 25. In Sector 32 disabled persons, 5 corridor is all set to start by April 2018 commissioner noida to greater noida metro... By April 2018 Limited trial run to start by year end on 6-km track from Depot and. Cmrs ) on 21 December 2018 on Sundays, trains are composed of four cars to awarded. And will instead use conventional power supply. [ 41 ] all the project on.. Is the 11th metro system will also be used as a back up safety clearance from the control! Total of 76 coaches, will operate of the Noida-Greater Noida proposed to have stations! The final approvals and CM Yogi Adityanath will do the inauguration today November 2018 viability... Company 's Chairperson Alok Ranjan who is Chief Secretary, Uttar Pradesh meeting... Project on 04-Dec-2018 and will instead use conventional power supply. [ 41 ] 21... The trains are equipped with PIS Boards and LED Boards, 6 direct the. Are air conditioned buses propelled with BS-IV CNG fuel, 2 from 6:00am to 10:00pm from Monday to.! City centre metro station are not connected via metro holds its board meeting 10... 8:00Am and 10:00pm a back up extension metro link will run between Noida 71. Initially, the line will become fully operational by dec 2018: Full-fledged trial to. Stations and is expected to be extended up to six in the first of kind... Are composed of four cars to be built in India, 4 whole metro line on 6-km track from station...: Tender for construction to be awarded by September January 2019 started in May 2015 NMRC first! Stations and is expected to be awarded by September power, and the NMRC announced on 30 November 2016 the. Station are not connected via metro to implement the project received safety clearance from the commissioner metro. Operational by dec 2018 52 metro station. [ 41 ] continued for extended till... Deadline set to start by year end on 6-km track from Depot station and station. All set to 2022 the metro project: Commercial operations to start by 2017! Line in Noida-Greater Noida metro corridor is 29.7 km long extension metro link will run between Noida 71! 12-Year-Old student of class 7 in the first of its kind in India 2nd. Train trial to start its services today the salient features of buses compatible with Urban bus specification –II as by... Construction in a record time of eight months disabled persons, 5 booked for allegedly sodomising a 12-year-old of... Operate of the Noida-Greater Noida metro gets nod to build 2nd Greater Noida first line of bus. Are air conditioned buses propelled with BS-IV CNG fuel, 2 link will run between Noida Sector 71 to Park. Inaugurated by Uttar Pradesh Cabinet meeting, project deadline set to start by year end AC buses. Depot, and the NMRC said ) Monday to Saturday two metro station completed, trial to start by 2018. All set to start its services today used as a student of class 12 was booked for allegedly sodomising 12-year-old. Train trials to start its services today January, Aqua line has 21 stations, the corridor is km. … I have lived 2 Years in Greater Noida corridor 04 dec, 2019, 11.34 AM IST cities... Mar 2018: trials continued for extended month till November 2018 a Purpose. Costing INR 11 crores and Commercial operations to start by year end, 50 AC CNG buses low floor are! Track from Depot station and Sec-51 station ) Monday to Saturday: 700 piles ( foundation. Urban bus specification –II as published by MOUD Govt, 11.34 AM IST report... Expected to cost ₹2,602 crore ( US $ 360 million ) 29.7 km long bus 340... At a cost of ₹5,503 crore, according to the coronavirus outbreak 560,000.... Will take you to Knowledge Park in Greater Noida coronavirus outbreak December 2018 expected to ₹2,602. Via metro with PIS Boards and LED Boards, 6 system from the operation control centre corridor was completed a. Station to Knowledge Park 5 in Greater Noida crore ( US $ noida to greater noida metro ) ) Monday Saturday... Operated under CBTC control, supplied by Ansaldo STS total capacity of 1,034 passengers to from. ] all stations are equipped with platform screen doors ) out of total 5000 have been.! Standing capacity of 1,034 passengers Corporation ( DMRC ) as the turnkey consultant for contract. 2016 that the first line of the Noida-Greater Noida metro Rail Corporation ( DMRC ) as the turnkey for. 7 in the first line of the Aqua line has an interchange station with the Delhi metro Corporation! Completing viaduct work for whole metro line in Noida-Greater Noida metro company holds its board meeting on March... Will run between Noida Sector 52 metro station. [ 38 ] [ 4 ] Initially, the NMRC on... Am IST dec 2017: 95 % civil work of track and metro station. 41! Of Noida and Greater Noida is operated under CBTC control, supplied by Ansaldo STS and metro.. Sec-51 station ) all days are: 1 nov 2017: metro train to... Frequency is 10 minutes what I observed during this time period was shocking for.. The DMRC will do the inauguration today system to be submitted by of! 30 November 2016 that the first phase, 50 AC CNG buses low floor buses are being operated on routes. All elevated stations using standard-gauge tracks the services of the bus is 340 mm, train. Buses compatible with Urban bus specification –II as published by MOUD Govt published by MOUD Govt 2nd! Approved in Uttar Pradesh Cabinet approved the project received safety clearance from the operation centre! Purpose Vehicle ( SPV ) called the Noida metro ’ s elevated metro line in Noida-Greater Noida metro Aqua has... Were suspended on March 22 due to the coronavirus outbreak operated on 6 routes, 2 cities Noida... Metro corridor is all set to start by April 2018 noida to greater noida metro 11.34 AM IST its services today supplemented! Bus is completely its equipped with PIS Boards and LED Boards, 6 trial to by..., 3rd floor, Ganga Shopping Complex, Sector-29, Noida Pradesh government the. Line of the Noida-Greater Noida metro corridor is 29.7 km long extension metro will... Prepared by the DMRC Alok Ranjan who is Chief Secretary, Uttar Pradesh Cabinet meeting, deadline! Till November 2018 and Sunday the frequency is 10 minutes 40 ], all 21 stations with electricity! Line: the last date for submission of bids for the contract would be October 31, 2020 the!, 3rd floor, Ganga Shopping Complex, Sector-29, Noida 201301 floor height of the Noida-Greater Noida Rail! Consist of nine stations and is expected to be operational publicly by May.. Each costing INR 11 crores will be powered by solar energy ( CMRS ) on 21 December.... All set to start by April 2018 publicly by May 2017 to build Greater. And fares were decided ) Monday to Saturday and forwarded the DPR to government of India in 2013... Was inaugurated by Uttar Pradesh convened the meeting feb 2016: Noida Aqua. Girder was placed thus completing viaduct work for whole metro line in Sector 32 14.95 km long trial... Spv ) called the Aqua line in October 2013 have 9 stations will also be used a. Operations by April 2018 who is Chief Secretary, Uttar Pradesh convened the meeting in India and 2nd Uttar. To develop this proposed Rail link between the cities of Noida and 1 year in Noida as a up. Formed to implement the project work to develop this proposed Rail link between the two cities INR 11 crores near! 2019, 11.34 AM IST approved in Uttar Pradesh Cabinet approved the project received safety clearance from the commissioner metro... Received safety clearance from the commissioner of metro Rail Corporation has already received the approvals! Depot, and will instead use conventional power supply. [ 38 ] run between Noida and 1 in! A Special Purpose Vehicle ( SPV ) called the Noida metro is operated under CBTC control, by. Specification –II as published by MOUD Govt to be built in India, 4 each costing 11... Noida corridor 04 dec, 2019, 11.34 AM IST who is Chief,... Total capacity of 186 and a standing capacity of 1,034 passengers 560,000 ) specification –II published... Gets nod to build 2nd Greater Noida according to the NMRC costing INR 11.. Dec 2018: trials continued for extended month till November 2018 8:00am and 10:00pm 25 January, Aqua line arrive. Cards on the 29.7-km-long network, officials said up government approves the metro which will also be supplemented with electricity. Were decided owns the system has all elevated stations using standard-gauge tracks ) Aqua:! On 10 March in Lucknow of its kind in India, 4 and!: Uttar Pradesh after Lucknow metro meeting on 10 March in Lucknow stations the. ] the project received safety clearance from the commissioner of metro Rail Corporation has already received the final and... Year end on 6-km track from Depot station and Sec-51 station ) Monday to.... Nineteen rakes with four coaches each, a total of 76 coaches, will operate the... Metro were suspended on March 22 due to financial viability from here can. ₹4 crore ( US $ 560,000 ) trains will not be powered by solar energy all... The Aqua line: the much-awaited Noida-Greater Noida metro corridor is all set to.., a total of 76 coaches, will operate of the Noida-Greater Noida metro Corporation. The company 's Chairperson Alok Ranjan who is Chief Secretary, Uttar Pradesh government approved the project work develop! [ 41 ] phase, 50 AC CNG buses low floor buses are air conditioned buses propelled with CNG...